Ministry of Public Works
Road 245, Al Muţlā‘ - Erosion Control and Slope Protection
Scope: | Slope construction and soil stabilization for protection and erosion control. |
Products: | 3S-100 |
Application: | Topical method |
Duration: | 10.04.2023 – 16.05.2023 |
Overview:
AECON and the esteemed Ministry of Public Works joined forces to address the issue of soil erosion and protection of water trenches parallel to road 245 and connected shoulders during heavy rainfall. The project focused on utilizing our innovative 3S-100 solution for slope stabilization and erosion control ensuring the functionality of water trenches and protecting the highway infrastructure.
The successful completion of the project and achievement of the stated objectives played a significant role in preventing soil erosion, safeguarding water trenches, and improving the overall stability of the highway infrastructure.
Objectives:
- Erosion control during heavy rainfall.
- Slope protection.
- Protection of water trenches.
Activities:
- Engineering surveys.
- Site preparation.
- Slope construction.
- Slope & bridge stabilization.